Pallet Insertion Glovebox/hood Control Ladder Diagram. Final Project Report

Pallet Insertion Glovebox/hood Control Ladder Diagram. Final Project Report

4.11 - 1251 ratings - Source



The pallet insertion glovebox/hood (G/H) is a special confinement space that will be designed to allow for insertion of pallets into the Stacker/Retriever (S/R) area. The S/R a large vault that is kept at negative 1 inches w.c. relative to the atmosphere and is used for the safe storage of special nuclear material. The S/R system uses a vehicle to move the special nuclear material that are placed on the pallets from the storage bins to input/output (I/O) stations and vice versa. As the name suggest the I/O stations are used to place the material into the S/R vault or to remove material from the S/R vault. The pallets are specially designed structures that will hold certain numbers of the material containers in a safe configuration. To store additional material containers, there is a need to insert additional pallets in the SIR vault. Due to the presence of radioactive contamination and the fact that the vault must be kept at a negative pressure at all times, one of the several I/O stations will be modified so that pallets could be inserted into the S/R vault. The ventilation system for the S/R area is a dedicated system that recirculates nitrogen with less than 5% oxygen by volume throughout the area while exhausting small option of the nitrogen to keep the S/R at negative 1 inches w.c. relative to the atmosphere. The rooms surrounding the G/H and the S/R area are maintained at negative of 0.3 inches w.c. relative to the outside atmosphere. Both the G/H and the control system for the G/H will be designed such that the confinement requirements of the S/R and the G/H system will not be jeopardized. A ladder diagram will be developed to illustrate the control system.Both the G/H and the control system for the G/H will be designed such that the confinement requirements of the S/R and the G/H system will not be jeopardized. A ladder diagram will be developed to illustrate the control system.


Title:Pallet Insertion Glovebox/hood Control Ladder Diagram. Final Project Report
Author:
Publisher: - 1995
ISBN-13:

You must register with us as either a Registered User before you can Download this Book. You'll be greeted by a simple sign-up page.

Once you have finished the sign-up process, you will be redirected to your download Book page.

How it works:
  • 1. Register a free 1 month Trial Account.
  • 2. Download as many books as you like (Personal use)
  • 3. Cancel the membership at any time if not satisfied.


Click button below to register and download Ebook
Privacy Policy | Contact | DMCA